Visit Blast-One International United States.

1800 882 229

Specialist suppliers to
the Blast Cleaning &
Coating Industry

Abrasive Recycling Equipment
Description

Garnet Recycling Systems

To use your Garnet Abrasive over and over again...

Garnet Recycling Systems give you the ability to use your Garnet Abrasive over and over again for maximum cost savings. Abrasive consumption as low as 1.6kg Garnet per m2 have been reported by very satisfied customers with recycling. Recycling allows for greatly reduced abrasive purchases and reduced transport, handling and disposal costs.

The Garnet Recycling System can be accurately adjusted to achieve the optimum particle size balance for any particular blasting requirement. Recycling is done in a dry process. Wet or damp Garnet must be dried prior to reprocessing.

Garnet Recycling System

MK COMBI Recycling System

The Garnet Recycling System Model MK COMBI is a specially designed compact recycling system for the effi cient cleaning and reprocessing of used Garnet for immediate re-use. The MK COMBI is a fully assembled unit with central lifting point for easy transportation and setting up on site. Only an electrical connection and compressed air supply are needed for immediate operation.

The MK-COMBI is designed to clean used Garnet. All trash such as cigarette butts, broken glass, paint fl akes, welding rods, stones etc. are removed from the used Garnet. In addition the system will remove broken Garnet grains [fines] and dust particles from the used material. The system uses a dry cleaning process and all used Garnet must be totally dry for processing.

The MK-COMBI is a low maintenance and easy to operate system with adjustable controls for material fl ow and Airwash cleaning. The total throughput of the system is dependent on the degree of cleanliness of the used/dirty garnet and the degree of fi nes extraction required. Typical throughput capacity is up to 7 metric tonnes per hour.

MK COMBI Recycling System

Garnet Recycling System Specifications

Model Function Electrical Power Required Service AmpsCompressed Air Required @ 100psi Total Filter Area Max. Through- put of used Garnet Ducting to Dust CollectorAdjustment of Fines ExtractionHeightLengthWidth
voltsampscfmsq ftkg/hrmmmmmm
MKMSmall projects240V -
1 phase
10202262000External ductingFully adjustable suction capacity and fines extraction3700 *25001800
MKVBlast sheds415V -
3 phase
15254525000 - 7000External ducting330026003300
MK CombiMobile sites415V -
3 phase
15306805000 - 7000Internal ducting420037002200

* MKM can be installed in a pit.

Why Recycle Garnet?

Garnet is one of the world’s most efficient blasting abrasives in terms of high speed blasting, very low abrasive consumption, very low dusting and no adverse environmental or health impact. Because Garnet’s grains are among the hardest and toughest minerals known to man, weathered and toughened over thousands of years, they do not shatter on blasting impact. Depending on surface hardness and nozzle pressure, typically only about ten percent of the Garnet grains break on impact, forming new sharp cutting edges thus maintaining most of their superior effectiveness and cutting ability even after many uses.

In Blasting Sheds, Field Blasting Yards and all other applications where the used Garnet can be recovered, Garnet can be very successfully recycled many times. Garnet Recycling Systems are designed and built to reprocess used Garnet for immediate re-use in blast sheds and field applications. The systems are of modular design and are easily set up and relocated. Garnet Recycling Systems produce exceptionally high quality reusable Garnet through a sequence of screening and vacuum extraction, utilizing Garnet’s unique grain size and specific gravity characteristics.

MK COMBI Recycling System
p33_pic3_F

Site Quick Links